Data Network Upgrade St Andrews Aged Care Byron Bay

This was 100k dollar data network install job to refit Byron Bay Site, after St Andrews took over from Ferros Care, for Club IT. The project took 3 months to complete and involved a leading hand and 2 electricians onsite. Works included. Removal of existing obsolete data network. Install of Cat 6 structured network. Install […]

Gaming Room Upgrade at Byron Bay Services Club

This was 35k dollar job for electrical and data upgrade works for the new gaming area at Byron Bay services 2024. The project took 1 months to complete and involved 2 electricians onsite. Works included. Removal of existing obsolete data network. Install of Cat 6 structured network for gaming area. Install of IP security cameras. […]

Living School Conway St Flood Refit

This was 650k dollar electrical job to refit Living School after the 2022 floods, with Balanced Earth Constructions being the principle building contractor The project took 4 months to complete and involved a leading hand and 2 electricians onsite. Works included. Demolition and removal of existing electrical and data cabling and equipment that was flood […]

Lismore Police Station Flood Refit 2022

This was 1.5 million dollar electrical job to refit Lismore Police Station after the 2022 floods for Primal Systems, with Intrec being the principle building contractor The project took 5 months to complete and involved a project manager, leading hand and 8 electricians onsite. Works included. Demolition and removal of existing electrical and data cabling […]

Sample Post 1

Lorem ipsum dolor sit amet consectetur adipiscing elit placerat augue, class tristique eu in eget nam curabitur taciti, curae metus varius vehicula iaculis dignissim habitasse rutrum. Natoque scelerisque suspendisse suscipit proin facilisis quisque dictum senectus tempus ullamcorper varius ridiculus mollis, porta dignissim risus parturient maecenas vestibulum tristique morbi mus dictumst netus. Tellus ultricies quam aenean […]